Projects

Project Portfolio · 2019–2026

Engineering that
shows in the work.

Selected recent and ongoing works across water infrastructure, HDPE pipelines, storage systems, civil construction, rehabilitation and associated engineering works.

17 Recent Works Listed
10 Completed
7 Ongoing
2019–26 Portfolio Period
Aqua Realm engineering construction project
On Site Water infrastructure, civil works and engineering delivery.
HDPE pipeline welding work
Aqua Realm building construction project

From underground pipelines to major civil infrastructure.

Aqua Realm Engineering and Services Limited delivers practical engineering and construction solutions across multiple project environments in Ghana.

Water & Pipeline Systems

HDPE pipeline installation, relocation, pressure testing, disinfection, valves, fittings and associated works.

Civil & Building Works

New construction, office complexes, structural works, refurbishment and rehabilitation projects.

Storage & Pump Systems

Ground tanks, elevated storage tanks, pump houses, pumping systems and related pipework.

Rehabilitation & Utilities

Rehabilitation, utility relocation, thrust boring, drainage-related works and infrastructure upgrades.

Real work. Real sites.

A visual look at construction, water infrastructure, pipework and completed project environments.

Aqua Realm civil engineering works Civil & Infrastructure Works
Aqua Realm pipeline installation work Pipeline Installation
Water storage tank project Water Storage
Aqua Realm completed building project Building Works

Project portfolio.

Browse the company's recent completed and ongoing works. Use the filters or search to find specific projects, clients or years.

Showing 17 projects

PROJECT 01 Ongoing
2026

Construction of UEW Co-operative Credit Union Office Complex – Budumburam

Client UEW Co-operative Credit Union Ltd
View project scope

Construction of a 5-storey office complex.

PROJECT 02 Ongoing
2026

Relocation of GWL Pipelines along Liberation Road

Client Ghana Water Ltd – Accra East Regional Office
View project scope

Excavation, backfilling, butt welding and laying of 400mm, 280mm, 160mm and 110mm HDPE (PN10) pipeline. Pressure testing and disinfection, together with construction of valve chambers.

PROJECT 03 Ongoing
2026

Renovation of Staff Bungalow – University of Ghana

Client University of Ghana
View project scope

Renovation of Staff Bungalow (No. 1 Lower Hill), University of Ghana, Legon.

PROJECT 04 Ongoing
2026

Replacement of Asbestos Pipes with HDPE Pipes in Akosombo – Phase II

Client Volta River Authority, Electro Volta House, Accra
View project scope

Replacement of asbestos pipes with HDPE pipeline. Pressure testing and disinfection. Installation of pillar fire hydrants and valves, together with construction of valve chambers.

PROJECT 05 Ongoing
2026

Construction of Office Block for CUA Central Region Chapter – Phase 1, Cape Coast

Client Ghana Co-operative Credit Union, Cape Coast
View project scope

Construction of the ground floor of a proposed 3-floor office complex.

PROJECT 06 Completed
2026

Dawa – Tema Transmission Construction Phase 1 & 2

Client Southern Water Company Ltd, Tema Free Zone Enclave
View project scope

Excavation, backfilling, butt welding and laying of 6km of 450mm HDPE (PN16) pipeline, including pressure testing and disinfection.

PROJECT 07 Completed
2024

Construction of Ground Level Tank with Associated Works at Tema Free Zone – Lot 1

Client Ghana Free Zones Authority
View project scope

Construction of a 6,800m³ reinforced concrete ground water storage tank.

PROJECT 08 Completed
2024

Construction of Pump House with Control Panels and Other Accessories at Tema Free Zone – Lot 2

Client Ghana Free Zones Authority
View project scope

Construction of pumphouse, installation of pumps and associated pipework.

PROJECT 09 Ongoing
2024

Construction of Overhead Tank with Associated Works at Tema Free Zone – Lot 3

Client Ghana Free Zones Authority
View project scope

Construction of a 2,800m³ elevated steel water storage tank.

PROJECT 10 Ongoing
2024

Rehabilitation of Ofankor – Nsawam Road: Relocation of GWCL Mains

Client Dakal Construction Works
View project scope

Excavation, backfilling and butt welding of 90mm–400mm HDPE (PN10) pipeline. Supply and installation of pipes, valves and fittings, construction of valve chambers and thrust blocks, pressure testing and disinfection.

PROJECT 11 Completed
2023

Greater Accra Resilient and Integrated Development Project – Thrust Boring for Relocation of Water Supply Pipelines and Valves at Ayikai Street, Kaneshie

Client Ministry of Works and Housing
View project scope

Thrust boring, butt welding and laying of 560mm HDPE (PN16), including installation of valves and fittings at the proposed drainage crossing.

PROJECT 12 Completed
2023

Construction of Selected Roads in Sekondi and Takoradi – Water Pipeline Relocation

Client Viabuild / Dakal Construction Works
View project scope

Excavation, backfilling and butt welding of 90mm–560mm HDPE (PN10 & PN16) pipeline. Supply and installation of valves and fittings, construction of valve chambers and thrust blocks, pressure testing and disinfection.

PROJECT 13 Completed
2023

Refurbishment and Extension of UEW Co-operative Credit Union Office Complex

Client UEW Co-operative Credit Union Ltd
View project scope

Refurbishment of the existing 2-storey office block and construction of a new 3-storey office complex.

PROJECT 14 Completed
2022

Dry Bulk Terminal Project – Water Utilities Supply to Takoradi Port

Client GPHA / Amandi Investment Limited
View project scope

Supply of pipes and fittings, excavation, backfilling and butt welding of 250mm HDPE (PN10) pipeline. Installation of valves and fittings, construction of valve chambers and thrust blocks, pressure testing and disinfection.

PROJECT 15 Completed
2021

Decommissioning and Re-engineering of Kpone Landfill – Construction of French Drain

Client Construction Ambassadors Ltd
View project scope

Excavation, backfilling, butt welding and perforation of 1,400m of 200mm HDPE (PN10) pipeline, placement of non-woven geotextile, gravel surround and construction of sump.

PROJECT 16 Completed
2020

Construction of Potable Water Reticulation for Tetrem RAP for Asanko Gold Mine

Client DRA / Amor De Dios Ltd
View project scope

Excavation, backfilling, butt welding and laying of 12km of 250mm, 160mm, 110mm and 63mm HDPE pipeline. Installation of valves and fittings, installation of 32 No. 20,000-litre poly tanks, mechanization of 3 boreholes, construction of valve chambers and a pumphouse, and pressure testing of pipelines.

PROJECT 17 Completed
2019

Design and Construction of Alternative Cold Water Supply Pipeline for Movenpick Ambassador Hotel, Accra

Client Movenpick Ambassador Hotel
View project scope

Butt welding and laying of 200m of 125mm HDPE pipeline, installation of valves and fittings, and installation of wall brackets for supports and anchors.

No projects match your current filter or search.
Engineering & Construction

Have an infrastructure project to discuss?

Talk to Aqua Realm Engineering and Services Limited about your water, pipeline, civil or construction requirements.

Scroll to Top